HELSINKI · ESPOO · VANTAAOur people. Our vehicles. Your fresh start.Suomeksi & in English
nordmuutto
Get a quote
Moving servicesPricingMoving guidesGet a quote

MOVING COMPANY IN HELSINKI

Office moving in Helsinki, with a clear plan.

An office relocation starts with careful coordination. We agree on the stages, contacts and vehicles to get your workplace to its next address.

Illustrative moving scene in Helsinki
AI-generated illustration, not a photograph of a completed Nordmuutto move.

BUILT AROUND YOUR MOVE

An office move planned stage by stage

Include the number of workstations, a furniture list and your preferred schedule.

Office moves planned by workstation

The easiest way to size an office move is by workstation. Once we know how many workstations are moving and what each one includes, we can estimate the vehicles, the number of movers and how long the work will take. Count the shared spaces too: meeting rooms, the break room and the archive often add a surprising amount to the load.

  • Desk: standard or electric sit-stand, and whether it needs to be taken apart for transport
  • Office chair, pedestal drawers and any personal locker
  • Monitors, docking stations and other equipment to be packed
  • Work papers and personal belongings in boxes
  • Shared spaces: meeting rooms, break room, printer area, storeroom and archive

Weekend office moves without downtime

We also do office moves on Saturdays and Sundays. When workstations are packed on Friday and the move happens at the weekend, your team can get back to work at the new office on Monday morning. If furniture assembly is part of the booking, there is time for it and a joint final check before the working week starts.

On a larger move, staging cuts downtime even further. The archive, storeroom and rarely used items can move first, and the workstations people use every day can follow in the final stage.

Labels and floor plans

Clear labelling decides how quickly the new office is up and running. When every workstation has its own code on the new floor plan, the movers can take everything straight to the right place without sorting it first.

  • Number the workstations on the floor plan by floor and position: 3.12, for example, is workstation 12 on the third floor.
  • Put the same code on every box from that workstation, and on its chair, pedestal and monitors.
  • Put the codes up on the doors and desks of the new premises before moving day.
  • Give shared spaces short, unambiguous names, such as Break room or Archive 2.
  • Label separately anything that stays at the old premises or goes to recycling.

What the movers do and what your company handles

A clear split of tasks means nothing is left undone on Monday morning. We carry, transport and place your belongings as agreed, and furniture disassembly and assembly are agreed in the quote. You will find a fuller task list in our office moving checklist. These tasks usually stay with your company:

  • IT: your own IT support or IT partner backs up data, disconnects equipment before the move, and reconnects and tests it at the new office.
  • Confidential material: a named person packs it and receives it at the other end.
  • Staff instructions: who packs their own workstation, and by when.
  • Change of address: the new company address is registered free of charge in the YTJ service. It isn’t passed on from the Trade Register to Posti, so notify Posti separately.

Finnish Patent and Registration Office: company address and contact details (in Finnish)

Building rules: lifts, loading and notices

In commercial buildings, moving arrangements are usually agreed with the property manager, building maintenance or reception. Find out the following at both buildings in good time and let us know, so we can book the right time and vehicles. If the van will have to stand in the street, see our guide to moving van parking.

  • Goods lift booking, load capacity and door dimensions
  • Where the loading dock or loading area is, and when it can be used
  • Access to the yard and parking for the moving van
  • Doors, access control and alarms at the weekend
  • Any building requirements for protecting floors, walls and lifts
  • A notice to other tenants and building users

Sample timeline: a weekend office move

Every office move is different. This example shows how the preparations for a weekend move can be paced:

  1. 1–2 months before: ask for a quote, name a contact person and fix the moving weekend.
  2. 3–4 weeks before: book goods lifts and loading areas, and agree the tasks with your IT support.
  3. 2 weeks before: finalise the floor plan and workstation codes.
  4. A week before: give staff the packing instructions and labels.
  5. Friday: workstations are packed and IT support disconnects the equipment.
  6. Saturday: we carry and transport everything and place it according to the floor plan.
  7. Sunday: furniture assembly, if agreed, and a joint final check.
  8. Monday: work continues at the new office, and IT support checks the connections.

What does an office move cost?

The price depends on the number of workstations and amount of furniture, floors and lifts, the carrying distance from the loading point, the driving distance and whether the move happens in one go or in stages. Furniture disassembly and assembly and other extras are itemised in the quote.

The quote also sets out the payment terms and invoicing details. If your invoice needs a purchase order number, reference or cost centre, mention it in your quote request. The quote is free, and you always get it in writing.

Extra services for your office move

You can add these to the same quote:

SOMETHING ON YOUR MIND?

Your moving questions, answered.

Can we move the office at the weekend?

Yes. We move offices on Saturdays and Sundays too, so your work doesn’t have to stop. Mention your preferred weekend in the quote request, and we will plan the schedule and building arrangements around it.

Do you move computers and monitors?

We transport packed computers, monitors and other equipment along with everything else. Agree with your own IT support who disconnects the equipment before the move and who reconnects it at the new office.

Can the move be done in stages?

Yes. The stages are agreed in the quote. For example, the archive and storeroom can move first and the workstations last.

What do you need for a quote?

Both addresses and floors, the number of workstations, a list of the largest furniture, and lift and loading details. A floor plan and photos make the quote quicker to prepare.

How early should we start planning?

The earlier, the better. Building bookings, your IT support’s schedule and informing staff all take time, so ideally start planning at least a month before the move.

Can we deal with you in English?

Yes. We serve customers in Finnish and English, so you can plan the move with us in either language.

YOUR NEXT CHAPTER IS CLOSE

Get a quote for your office move

Share the basics of your move. We’ll clarify anything else needed for your quote. A quote request is not a confirmed booking.

01 Your move02 Your details

Where to next?

Fields marked * are required.

Extra services (optional)

Free quote. No obligation.

Get a quote

Site under maintenance

We are updating our website and contact details. We will be back soon.

You can still send a quote request through the form, and we will get back to you.